NextGen Planning takes a turnaround from first man-hour estimate to field execution — a catalog-driven estimator, resource plans by contractor, CPM scheduling, procurement, and daily progress, all in one system.
No more disconnected spreadsheets. Every estimate feeds the schedule, the schedule feeds procurement, and the field feeds progress back — one source of truth.
Build estimates from a 1,145-row MH catalog across 95 equipment types. WBS tree by phase, equipment and task, with service, crew-by-size, and flange-class factors applied automatically.
Organize labor by contractor and craft, track indirect and support staff, and see manning demand on a live histogram grouped by craft or company.
Forward and backward pass scheduling with total/free float, resource leveling, critical path, and start-shift or crew-stretch leveling modes.
Parse vendor quotes, generate SAP requisitions and RFQs, and produce material take-offs with ANSI-correct flange hardware straight from the estimate.
Track candidate projects through a Kanban pipeline, invite contractors by email, and collect and compare sealed bids on a public response portal.
A draggable multi-year Gantt of candidate projects by department and priority — plan the whole turnaround portfolio, then promote a candidate into a full estimate.
NextGen Planning follows the real turnaround workflow — nothing is re-keyed between stages.
Pull catalog tasks into a WBS estimate with factors, crews, and per-craft cost.
Assign contractors, level resources, and generate a CPM schedule with float.
Turn the estimate into MTOs, RFQs, and SAP requisitions with vendor quotes.
Print field work packages and capture dated % complete for the S-curve.
Daily progress entry rolls straight into an earned-value S-curve, so planned versus earned man-hours are never a guess.
Purpose-built calculators for the trades — each one sends its result straight into the project estimator.
Man-hour lookup across the full catalog with condition, service, and repair factors.
Load build-up, crane utilization vs. chart, sling and shackle sizing, suggested crane class.
TEMA tube count, bundle weight, and pull force with a shell & tube schematic.
Repair-zone area picker, automated weld processes, and full PWHT cycle breakdown.
Volume-based erect and dismantle MH, crew and duration, with LiftBot productivity factor.
Upload a blind list, split operations from mechanical hours, and push phased lines to the estimate.
A full web platform for planners, plus a native iOS companion for the field.
Bring estimating, scheduling, procurement, and field execution into one platform built for industrial maintenance and turnaround teams.